Brixton Metals Provides 2023 Summary and a 2024 Outlook
January 10, 2024 – Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to provide a summary of the past year and an outlook for 2024. Chairman and CEO Gary R. Thompson stated: “Drilling at the Camp Creek copper porphyry target was successful in expanding the mineralization footprint significantly both on […]
Brixton Metals Drills 9m of 1037 g/t Silver including 4m of 2043 g/t Ag from Hole-283 and Drills 7m of 0.37% Cobalt Including 4m of 0.60% Co from Hole-265 at its Langis Project, Ontario
March 20, 2023 — Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce final drill results from the 2022 drill campaign at its wholly owned Langis Project. The project is located in the Cobalt Camp of Ontario, about 500km north from Toronto. The 2022 program started in early November and was […]
Brixton Metals Drills 30.50m of 0.35% Cobalt Including 10.02m of 0.92% Co and Including 0.5m of 9.01% Co at its Langis Project, Ontario
December 13, 2022 – Brixton Metals Corporation (TSX-V: BBB, OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce the first batch of drill results from its wholly owned Langis Project. The project is located in the Cobalt Camp of Ontario which is about 500km north from Toronto. The objective of the 2022 drill program was […]
Brixton Metals Begins IP Geophysical Survey at its Langis Project, Ontario
April 11th, 2022 – Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce the commencement of a 70 line-km Alpha IP Geophysical Survey and surface sampling-mapping campaign at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. Chairman and CEO of Brixton, Gary R. Thompson […]
Brixton Metals Drills 24m of 187 g/t Silver, including 10m of 356 g/t Ag, including 2m of 1077 Ag at its Langis Project, Ontario
May 6, 2021 – Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce further high-grade silver results from its exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. The fall/winter 2020-2021 program consisted of a total of 18,453.35m of NQ core over […]
Brixton Metals Drills 8m of 860 g/t Silver, 0.17% Cobalt within 31m of 272 g/t Ag, 0.05% Co at its Langis Project, Ontario
March 24, 2021 – Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce further high-grade silver results from its fall/winter exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. This news release includes holes LM-21-214 to LM-21-219 and is a total of […]
Brixton Metals Drills 2m of 1898 g/t Silver and 5m of 547 g/t Silver at its Langis Project, Ontario
March 10, 2021 – Brixton Metals Corporation (TSXV: BBB) (OTCQB: BBBXF) (the “Company” or “Brixton”) is pleased to announce further high-grade silver results from its fall/winter exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. This press release includes assays from 78 shallow diamond drill core holes, LM-20-136 […]
Brixton Metals Drills 375 oz/t (11,663 g/t) Silver, 0.7% Cobalt over 1.2m at its Langis Project, Ontario
February 1, 2021 – Brixton Metals Corporation (TSXV: BBB) (the “Company” or “Brixton”) is pleased to announce further high-grade drill results from its fall/winter exploration program at its wholly owned Langis Project located in the Cobalt Camp of Ontario, Canada. The fall/winter program consists of 20,000m of drilling, of which 11,533.65m has been completed. Assay […]
Brixton Metals Summarizes 2020 Results and Outlines 2021 Plans
January 27, 2021 – Brixton Metals Corp. (TSX: BBB, OTCQB: BBBXF) is pleased to provide highlights of the results of its 2020 exploration activities and outlines its 2021 exploration plans to advance the district-scale Thorn Project in the Golden Triangle of BC, and its other wholly owned projects. 2020 Highlights: Chairman and CEO Gary R. […]
Brixton Metals Drills 4m of 370 g/t Ag including 1m of 1080 g/t Ag (34 opt Ag) at its Langis Project, Ontario Canada
January 8, 2021 – Brixton Metals Corporation (TSXV: BBB) (the “Company” or “Brixton”) is pleased to announce the second round of drill results from its fall/winter exploration program at the Langis Mine Project located in the Cobalt Camp of Ontario. The assays for this round are from 14 holes totaling 1673.85m of NQ size core. […]